Artwork

内容由Michigan Department of Transportation提供。所有播客内容(包括剧集、图形和播客描述)均由 Michigan Department of Transportation 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal
Player FM -播客应用
使用Player FM应用程序离线!

Work progresses on the final phase of rebuilding I-696

20:32
 
分享
 

Manage episode 476357824 series 2920850
内容由Michigan Department of Transportation提供。所有播客内容(包括剧集、图形和播客描述)均由 Michigan Department of Transportation 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal

On this week’s Talking Michigan Transportation podcast, a conversation with Brian Travis, the Michigan Department of Transportation (MDOT) project manager overseeing the rebuilding of the central segment of I-696.
The work, which began in March and will continue through most of 2027, involves closing the eastbound lanes of I-696 from M-10 and Lahser Road east to I-75.
Travis explains that this is the last of three phases of the "Restore the Reuther" project, a $275 million rebuilding of the freeway. In 2019, the state completed work along the easternmost portion, along with the western end in 2023 and 2024.
The conversation also includes an update on MDOT’s second flex route, this one on I-96 in Oakland County. The project is nearing completion as crews prepare for the use of ramp metering to regulate the flow of traffic to the freeway.

A video explains the benefits of the flex route and ramp metering.

  continue reading

章节

1. Introduction to I-696 Rebuild Project (00:00:00)

2. Project Scope and Construction Challenges (00:05:05)

3. Complete Closure Strategy Explained (00:09:58)

4. Church Street Plaza Bridge Reconstruction (00:12:54)

5. Traffic Patterns and Detour Routes (00:17:09)

6. I-96 Flex Route and Ramp Metering (00:18:24)

223集单集

Artwork
icon分享
 
Manage episode 476357824 series 2920850
内容由Michigan Department of Transportation提供。所有播客内容(包括剧集、图形和播客描述)均由 Michigan Department of Transportation 或其播客平台合作伙伴直接上传和提供。如果您认为有人在未经您许可的情况下使用您的受版权保护的作品,您可以按照此处概述的流程进行操作https://zh.player.fm/legal

On this week’s Talking Michigan Transportation podcast, a conversation with Brian Travis, the Michigan Department of Transportation (MDOT) project manager overseeing the rebuilding of the central segment of I-696.
The work, which began in March and will continue through most of 2027, involves closing the eastbound lanes of I-696 from M-10 and Lahser Road east to I-75.
Travis explains that this is the last of three phases of the "Restore the Reuther" project, a $275 million rebuilding of the freeway. In 2019, the state completed work along the easternmost portion, along with the western end in 2023 and 2024.
The conversation also includes an update on MDOT’s second flex route, this one on I-96 in Oakland County. The project is nearing completion as crews prepare for the use of ramp metering to regulate the flow of traffic to the freeway.

A video explains the benefits of the flex route and ramp metering.

  continue reading

章节

1. Introduction to I-696 Rebuild Project (00:00:00)

2. Project Scope and Construction Challenges (00:05:05)

3. Complete Closure Strategy Explained (00:09:58)

4. Church Street Plaza Bridge Reconstruction (00:12:54)

5. Traffic Patterns and Detour Routes (00:17:09)

6. I-96 Flex Route and Ramp Metering (00:18:24)

223集单集

所有剧集

×
 
Loading …

欢迎使用Player FM

Player FM正在网上搜索高质量的播客,以便您现在享受。它是最好的播客应用程序,适用于安卓、iPhone和网络。注册以跨设备同步订阅。

 

快速参考指南

版权2025 | 隐私政策 | 服务条款 | | 版权
边探索边听这个节目
播放

OSZAR »